久久久久久一级I日韩性色视频I东北老女人avI欧美色777I久久wwwwI亚洲一区高清I黄色一级视频在线观看I综合激情四射I日本免费不卡I日本精品久久久久护士I人妻一区二区三I手机电影在线观看I欧美做受69I激情自拍视频I亚洲一级av毛片I九九热视I色婷婷综合久久久久中文字幕I国产精品精I午夜爱爱网I97av在线视频I在线观看精品黄av片免费I成人美女avI国产一区导航I91福利小视频I一区高清I一区二区三区精品视频

It's settled! The aviation base is built here in Zhuji! Invest 1.2 billion!
It's settled! The aviation base is built here in Zhuji! Invest 1.2 billion!

Time:2019-10-22

View volume:10911

Annual production project of 400000 complete gear reducers

ebf88042b1ee40888b0253793fd1d49e.jpg

Project location: Xiasihu area

Planned total investment: 30 million US dollars

Land use: 30 acres

Building area: 30000 square meters

The project is equipped with robots, vertical machining centers, etc., forming an annual production capacity of 400000 complete reducers. After reaching the production capacity, the output value can reach 270 million yuan and the tax revenue can reach 8.3 million yuan.


Annual production project of 400000 complete gear reducers

ebf88042b1ee40888b0253793fd1d49e.jpg

Project location: Xiasihu area

Planned total investment: 30 million US dollars

Land use: 30 acres

Building area: 30000 square meters

The project is equipped with robots, vertical machining centers, etc., forming an annual production capacity of 400000 complete reducers. After reaching the production capacity, the output value can reach 270 million yuan and the tax revenue can reach 8.3 million yuan.


Previous:Hangzhou Hongtu Metal's Annual Production of 400000 Units of Gear Reducers Project Commences Next:No more
Previous:Hangzhou Hongtu Metal's Annual Production of 400000 Units of Gear Reducers Project Commences Next:No more